Long Ridge Energy & Power
Long Ridge Energy & Power LLC operates a 485-505 MW natural gas combined-cycle power plant in Hannibal, Ohio (completed 2021), among the most efficient natural-gas plants in the world and the first US plant to blend hydrogen into a GE 7HA.02 turbine. Owned by FTAI Infrastructure Inc.; the site includes a co-located 200 MW data center campus on 1,600+ acres. Being acquired by MARA Holdings for approximately $1.5 billion.
Owned / funded by
Capital and control flowing in
MARA entered an agreement to acquire Long Ridge Energy & Power LLC (505 MW Ohio gas plant + 1,600 acres) from FTAI Infrastructure for approximately $1.5 billion to build a 200 MW AI data center campus. Closing expected Q3 2026 subject to HSR and FERC approvals.
Owns / has invested in
Capital and control flowing out
Long Ridge Energy & Power is being acquired by MARA Holdings from FTAI Infrastructure for approximately $1.5 billion (including assumed debt), with closing expected Q3 2026.
Data centers
1 project in the dataset
- MARA Long Ridge Hannibal Data Center· supplies energyHannibal, Monroe, OHAnnounced200 MW